# FHWA-NHI-06-089, Example 9-2 · Precast pile in silty sand

Precast pile in silty sand, Example 9-2 of Samtani & Nowatzki (2006), solved in Rischio. Ultimate capacity, Qu: 46.6 tons (source: 45.1 tons).

SourceManual

Samtani, N. C., & Nowatzki, E. A. (2006). Soils and Foundations Reference Manual, Volume II (FHWA-NHI-06-089). Federal Highway Administration. Example 9-2, p. 9-46.

ID `fhwa-nhi-06-089-9-2`

[Open in the studio](https://studio.rischio.io/examples/fhwa-nhi-06-089-9-2?utm_source=rischio.io&utm_medium=website&utm_content=docs-example) A copy, in your account [Open the PDF](https://www.fhwa.dot.gov/engineering/geotech/pubs/nhi06089.pdf)

Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to [hello@rischio.io](mailto:hello@rischio.io).

## The problem

What the source calculates: shaft resistance, Rs, toe resistance, Rt and ultimate capacity, Qu. Its problem, as Rischio's editor opens it in free mode:

The model, as the editor draws it. In the source: the sketch on p. 9-46.

## Source vs Rischio

|  | Source | Rischio | Difference |
| --- | --- | --- | --- |
| Shaft resistance, Rs | 40.1 tons | 41.5 tons | +3.5 % |
| Toe resistance, Rt | 5 tons | 5.06 tons | +1.1 % |
| Ultimate capacity, Qu | 45.1 tons | 46.6 tons | +3.3 % |

Opened in the studio in free mode, with no limits set, the model gives each value without a verdict.

The manual reads Nordlund's coefficients off its charts by eye, and the toe's limiting resistance at 30°, just below where that chart's curve begins. Rischio reads the same charts as AASHTO prints them and extends that curve along its first slope, so its shaft and toe resistances come out 3.5 % and 1 % higher. The example gives no load on the pile: the model carries one only so the tool runs, and the resistances don't depend on it.

## How it's calculated

-   [Shaft resistance → How Rischio adds up a pile's shaft, stratum by stratum: a driven pile by Tomlinson's α in clay and Nordlund's method in sand, a drilled shaft by FHWA GEC 10.](https://rischio.io/docs/deep-foundation/theory/shaft/)
-   [Toe resistance → How Rischio calculates a pile's toe: a driven pile's by Nordlund's method in sand, 9 cu in clay, and a drilled shaft's by FHWA GEC 10.](https://rischio.io/docs/deep-foundation/theory/toe/)
-   [Equations → Every step of the calculation, in order.](https://rischio.io/docs/deep-foundation/equations/)
-   [Piles in Rischio → The tool: what it checks, and its calculation report.](https://rischio.io/deep-foundation/)

## Nearest examples

-   [FHWA-NHI-16-064, Example D.10.1, 30 ft · H-pile in sand Federal Highway Administration (2016): nominal resistance, Rn](https://rischio.io/docs/examples/fhwa-nhi-16-064-north-abutment-30ft/)
-   [FHWA-NHI-16-064, Example D.10.1, 45 ft · H-pile to gravel Federal Highway Administration (2016): shaft resistance, Rs](https://rischio.io/docs/examples/fhwa-nhi-16-064-north-abutment-45ft/)
-   [FHWA-NHI-16-064, Example D.10.1, 60 ft · H-pile in gravel Federal Highway Administration (2016): shaft resistance, Rs](https://rischio.io/docs/examples/fhwa-nhi-16-064-north-abutment-60ft/)

---

Source: https://rischio.io/docs/examples/fhwa-nhi-06-089-9-2/