# FHWA-NHI-16-064, Example D.11 · Each pile's load in a group

Each pile's load in a group, Example D.11 of FHWA-NHI-16-064, solved in Rischio. Load on the most loaded pile: 323 kips (source: 323 kips).

SourceManual

Hannigan, Rausche, Likins, Robinson & Becker (2016). Design and Construction of Driven Pile Foundations: Comprehensive Design Example (FHWA-NHI-16-064). Federal Highway Administration. Example D.11, p. 46-49.

ID `fhwa-nhi-16-064-d11`

[Open in the studio](https://studio.rischio.io/examples/fhwa-nhi-16-064-d11?utm_source=rischio.io&utm_medium=website&utm_content=docs-example) A copy, in your account [Open the PDF](https://www.fhwa.dot.gov/engineering/geotech/pubs/gec12/nhi16009_v3.pdf)

Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to [hello@rischio.io](mailto:hello@rischio.io).

## The problem

What the source calculates: load on the most loaded pile. Its problem, as Rischio's editor opens it in free mode:

The model, as the editor draws it. In the source: Figure D-24, p. 48.

## Source vs Rischio

|  | Source | Rischio | Difference |
| --- | --- | --- | --- |
| Load on the most loaded pile | 323 kips | 323 kips | +0.1 % |

Opened in the studio in free mode, with no limits set, the model gives each value without a verdict.

## How it's calculated

-   [Pile groups → How Rischio checks a single pile and a pile group: the group as individual piles or as one block, Skempton's factor in clay, and the group efficiency.](https://rischio.io/docs/deep-foundation/theory/groups/)
-   [Equations → Every step of the calculation, in order.](https://rischio.io/docs/deep-foundation/equations/)
-   [Piles in Rischio → The tool: what it checks, and its calculation report.](https://rischio.io/deep-foundation/)

## Nearest examples

-   [FHWA-NHI-16-064, Example D.10.2, D.13 · H-pile in uplift Federal Highway Administration (2016): nominal uplift resistance, Rs](https://rischio.io/docs/examples/fhwa-nhi-16-064-north-abutment-uplift-28ft/)
-   [FHWA-NHI-16-064, Example D.13 · Pile row uplift, soil block Federal Highway Administration (2016): weight of the soil block, W](https://rischio.io/docs/examples/fhwa-nhi-16-064-north-abutment-uplift-block/)
-   [FHWA GEC 10 (2018), Example 11.6.1 · 2 × 2 shaft group Federal Highway Administration (2018): load on the least loaded shaft, Rz1](https://rischio.io/docs/examples/fhwa-nhi-18-024-11-6-1/)

---

Source: https://rischio.io/docs/examples/fhwa-nhi-16-064-d11/
