Enter the trials of a compaction test: the water content of each and the mass of the mold with the compacted soil. The calculator works out each trial’s dry density, draws the compaction curve under the 100 % saturation line, and gives the maximum dry density and the optimum moisture content. It covers the standard Proctor (ASTM D698) and the modified one (ASTM D1557), and it’s free and needs no account.
Calculator · ASTM D698 · D1557 · D4718
Compaction trials
One trial per water content, in increasing order. The mass is the mold's with its base and the compacted soil.
| Trial | Water content(%) | Mold with its base and the soil(kg) |
|---|---|---|
| #1 | ||
| #2 | ||
| #3 | ||
| #4 | ||
| #5 | ||
| #6 | ||
| #7 | ||
| #8 |
The standard asks for at least four trials, two on each side of the optimum. If the optimum falls at the edge, that side is short of trials.
Mold
The volume comes from its size, and it's the denominator of every density. A 4-inch mold holds about 944 cm³; the calculation takes what you measure, not a catalog value.
Soil and water
The specific gravity draws the 100 % saturation line, the test's physical limit. The water's density is the one at the laboratory's temperature.
Oversize particles (ASTM D4718)
Optional. If more than 5 % of the dry mass was retained on the method's sieve and left out of the test, enter that percentage: the calculator corrects the optimum and the maximum density to the total material. The correction holds up to 30 %.
Of the total dry mass. Empty, no correction.
Only with oversize.
Only with oversize.
- Trials
- 100 % saturation
8 compaction trials, 4 before the optimum and 4 after. The curve through the densest trial and its two neighbours peaks at 9.5 % water content, with 1899 kg/m³ of dry density: that's the test's optimum and maximum density
The test's result
| Quantity | Value |
|---|---|
| Mold volume(D/2)² · π · H | 919.8cm³ |
| Optimum water content · woptthe peak of the curve through the densest trial and its neighbours | 9.5% |
| Maximum dry density · ρd,maxthe same peak, without the water | 1899kg/m³ |
| Maximum dry unit weight · γd,maxg · ρd,max, to the nearest 0.02 | 18.62kN/m³ |
| Degree of saturation at the optimum · Sw · Gs / (Gs · ρw / ρd − 1) | 64% |
This calculator is offered for information and technical support. It doesn't replace professional judgment or the reviews due, and its use is the user's responsibility.
How it calculates
The two tests compact with different energy, but their calculation is the same. The mold’s volume comes from its measured inner diameter and height , and each trial’s density from the mass of soil in it:
is the mold with its base and the compacted soil, the mold with its base, and the trial’s water content. Beside the curve, the calculator draws the zero-air-voids line: the dry density the soil would have at each water content if water filled all its voids.
The maximum dry density and the optimum moisture content are read at the peak of the curve, as ASTM D698 asks: a parabola through the densest trial and its two neighbours. When the densest trial is the driest or the wettest, there’s no curve past it, and the optimum is that trial. The table also gives the maximum dry unit weight, , to the nearest 0.02 kN/m³ as the standard reports it, and the degree of saturation at the optimum, .
If part of the sample stayed on the method’s sieve and was left out of the test, the calculator corrects the results to the total material with ASTM D4718. It takes the share of oversize by dry mass (with ), the bulk specific gravity of the oversize particles and their water content :
and are the optimum and the maximum of the test. The density equation adds the volumes of the two fractions, so it assumes the finer soil fills all the space between the oversize particles. The correction is required above 5 % oversize and holds up to 30 %; past that, the calculator gives no corrected values.
The calculator warns about fewer than four trials or fewer than two on each side of the optimum, trials entered out of order from driest to wettest, a trial above the saturation line, which can’t happen, and an optimum at the driest or the wettest trial, which means the test needs points beyond it. It also warns when the oversize is above the 25 % that Methods A and B allow, or above the 30 % that the correction covers.
The full procedure, equipment and report are in the Academy lesson: Proctor compaction test.
How to use it
- Under Compaction trials, enter each trial’s water content, in %, and the mass of the mold with its base and the compacted soil, in kg, from the driest trial to the wettest. Add a trial and Remove the last change how many there are.
- Under Mold, enter the mass of the mold with its base, and its inner diameter and height in cm. A 4-inch mold holds about 944 cm³ (1/30 ft³), but the calculation takes the size you measure.
- Under Soil and water, enter the specific gravity of the soil, which draws the saturation line, and the density of water at the lab’s temperature, in kg/m³.
- Under Oversize particles (ASTM D4718), if more than 5 % of the dry mass stayed on the method’s sieve, enter that percentage, the bulk specific gravity of the oversize particles and their water content, in %. Leave it empty when there’s no oversize.
- Read the compaction curve with the 100 % saturation line. The headline figure is the optimum moisture content. The table gives the mold’s volume, the maximum dry density and unit weight, the degree of saturation at the optimum and, with oversize, the corrected optimum and maximum of the total material.
Restore the example brings back the eight trials of the worked example. If you don’t have , the specific gravity calculator works it out from a pycnometer test.
Frequently asked questions
What is a Proctor test used for?
It finds the densest state a soil reaches under a set compaction energy, and the water content that gets it there. Earthwork specifications use those two numbers as the target: the fill is placed near the optimum moisture content and compacted to a share of the maximum dry density.
What does 95 % Proctor mean?
That the dry density measured in the field is at least 95 % of the maximum dry density from the laboratory test the specification names, standard or modified. That share is called the relative compaction.
What is the difference between standard and modified Proctor?
The compaction energy. The standard test, ASTM D698, drops a 24.5 N (5.5 lbf) rammer 305 mm (12 in) onto three layers, for about 600 kN·m/m³. The modified test, ASTM D1557, drops a 44.5 N (10 lbf) rammer 457 mm (18 in) onto five layers, for about 2,700 kN·m/m³. More energy gives a higher maximum dry density at a lower optimum moisture content.
What is the zero-air-voids line?
The dry density the soil would reach at each water content with no air left in its voids: . No compacted point can lie above it, and on the wet side of the optimum the compaction curve runs close to it and roughly parallel.