A gabion retaining wall is a gravity wall built of wire baskets filled with rock, laced together and stacked in levels. It holds the soil with the weight of its stone, like a concrete gravity wall, and it’s designed with the same checks: sliding, overturning and bearing capacity, plus one of its own, each level against the level below it.
This guide covers what a gabion wall is made of, where it fits, how its design works, and a worked example: a 3 m wall on a creek bank, checked by hand and with Rischio’s engine, which gives the same numbers.
What a gabion retaining wall is
FHWA’s manual on earth retaining structures describes gabion walls as rows and tiers of orthogonal wire baskets filled with rock fragments and tied together (FHWA-NHI-07-071, 6.4.1). They are widely used to protect channels and riverbanks, and also as retaining walls, particularly in rugged terrain. Among retaining walls they belong to the modular gravity walls, with crib, bin and precast module walls: prefabricated units whose own weight, and the weight of what fills them, resists the earth pressure.
A gabion wall’s front and back can be vertical or stepped. The usual section is stepped in front, each level set back from the one below it, with a vertical back against the backfill. FHWA notes that walls higher than about 3 m (10 ft) are usually given a batter, leaning back into the soil at 1 in 10, 1 in 6 or 1 in 4, to improve their stability.
Advantages and limitations
What a gabion wall offers, by FHWA’s account (6.1, 6.4.1):
- It drains freely. If the backfill doesn’t trap water, the wall isn’t loaded by water pressure, and since it drains it resists frost.
- It’s flexible, so it suits compressible ground: gabion walls tolerate differential settlements of the order of 1/50, where most modular walls tolerate about 1/300 (6.6.7).
- It’s simple to build and needs neither skilled labor nor special equipment, which suits remote sites where baskets are assembled by hand and filled with local stone.
- It blends into the landscape, especially when built with local rock, and pipes can pass through it.
Its limitations:
- It takes a lot of labor, up to half of its cost, so it may not pay where labor is expensive.
- It needs good stone. If the rock isn’t local, the cost can rise until a gabion wall is no longer worth considering.
- The wire can corrode in aggressive environments, and baskets are easier to damage than concrete.
- It is built from the bottom up and isn’t suited to deep foundations.
FHWA finds gabion walls are typically not cost-effective above about 7.6 m (25 ft).
Gabion baskets, wire and stone
The baskets
Most gabions are steel wire mesh of two kinds (FHWA-NHI-07-071, 6.4.3):
- Hexagonal woven mesh, with double-twisted wires and an opening of about 83 × 114 mm (3.25 × 4.5 in). It is supplied folded flat; each basket is erected on site and laced along its edges.
- Square welded mesh, with an opening of about 76 mm (3 in), hot-dip galvanized after welding. It is stiffer and less flexible than woven mesh.
The wires of woven mesh are 2.0 to 3.8 mm in diameter (0.08 to 0.15 in); for permanent walls, at least 2.5 mm (0.1 in) and galvanized before weaving. In sea water or polluted water, the wire gets a PVC coating 0.4 to 0.6 mm thick. Baskets of nylon, polypropylene or polyethylene don’t corrode, but fire and ultraviolet light attack them, so their exposed faces are covered.
Baskets come in a standard width of about 0.9 m (3 ft), lengths from 0.9 to 3.7 m (3 to 12 ft) and heights of 0.3, 0.45 and 0.9 m (1, 1.5 and 3 ft). Longer baskets are divided into cells by diaphragms of the same mesh, which stiffen them and make them easier to assemble.
The rock fill
The rock should be sound, durable and well graded, between 100 and 250 mm (4 and 10 in), with no piece whose smallest dimension is under 100 mm, and without shale, soil or fines. Its porosity is generally 0.30 to 0.40, and it sets the unit weight of the gabions (FHWA-NHI-07-071, Eq. 6-3):
with the porosity of the rock fill, the specific gravity of the rock and the unit weight of water. A rock with packed to gives kN/m³. The weight of the wire is small and is usually left out.
The backfill and the filter
Behind the wall goes an open-graded granular backfill, compacted like that of other gravity walls. A filter, a geotextile or a graded soil, covers the back and the steps of the wall so that the backfill doesn’t wash into the voids of the stone. In a wall that stands partly in water, the backfill has to drain freely, or water pressure builds up behind the wall when the water in front drops.
Gabion wall design: what is checked
A gabion wall is checked whole, like any gravity wall, and level by level.
The loads
- The weight of each level, its area times the unit weight of the gabions. Below the water, the voids fill with water and a gabion weighs , with the uplift on the base acting separately.
- The active earth pressure of the backfill. AASHTO’s commentary applies Coulomb’s theory to modular walls (C3.11.5.3), with the thrust acting on the back of the wall. Where the back is stepped, the thrust is taken on the plane from the heel to the back corner of the top level, and the soil between that plane and the baskets counts as part of the wall. The friction between the backfill and the wall, , may be reduced where a geotextile lines the back (FHWA-NHI-07-071, 6.6.9). Rankine and Coulomb covers both theories.
- Water. With the stone and the backfill draining freely, FHWA designs gabion walls without water pressure. A wall that stands in a river or a creek gets the water’s thrust behind it and the uplift under its base.
The checks of the whole wall
- Sliding of the wall on its base: the friction of the base on the foundation soil against the horizontal forces.
- Overturning, judged as AASHTO does by the eccentricity of the resultant on the base, . Under AASHTO’s factored loads the resultant on soil stays within the middle two-thirds of the base (11.6.3.3); with factors of safety it stays within the middle third, .
- Bearing capacity of the foundation soil under the base, on its effective width .
- Global stability of the slope that holds the wall, by limit equilibrium.
With factors of safety, FHWA’s Geotechnical Engineering Circular No. 6 gives 1.5 against sliding (5.4) and 3.0 on bearing (5.2.6), and the middle third for the eccentricity (6.4.1).
Each level on the one below
A gabion wall can also fail through itself: the levels above a joint slide on the level below, or tip over it. FHWA asks that, in a stepped wall, sliding and eccentricity be checked at each change of section, ignoring the resistance of the wire mesh and of the connections between baskets (FHWA-NHI-07-071, 6.6.9). At each joint, the block of levels above it takes its own earth pressure, over its own height, and slides on the friction angle between gabions.
Worked example: a 3 m gabion wall on a creek bank
A creek is eating into the bank below a garden, and a 3 m gabion wall will hold the bank with the stream standing against its face. Check the wall with factors of safety: 1.5 against sliding, 3.0 on bearing, and the resultant within the middle third of the base and of each level.
- Three levels 1.00 m high: level 1, at the base, 2.50 m wide; level 2, 2.00 m; level 3, 1.50 m. The steps are in front, 0.50 m each, and the back is vertical, so the base is = 2.50 m.
- The base is 0.50 m below the ground in front.
- Gabions: = 17 kN/m³, porosity = 0.35, friction angle between levels 35°.
- Backfill, a silty sand: = 18.5 kN/m³, = 20.5 kN/m³, = 32°, = 0, level.
- Foundation, alluvial sand and gravel: = 19.5 kN/m³, = 21 kN/m³, = 34°, = 0.
- Water: the creek stands 0.50 m deep against the face, 1.00 m above the base, and the water behind the wall is at the same level, 2.00 m below the crest.
- = 9.81 kN/m³. Moments are taken about the toe, O.
Step 1: the weight of each level
Level 1 is under water, its voids full, so it weighs kN/m³. Levels 2 and 3 are above the water.
| Level | Width (m) | Area (m²/m) | Unit weight (kN/m³) | (kN/m) | Arm from O (m) |
|---|---|---|---|---|---|
| 1 | 2.50 | 2.50 | 20.43 | 51.08 | 1.25 |
| 2 | 2.00 | 2.00 | 17.00 | 34.00 | 1.50 |
| 3 | 1.50 | 1.50 | 17.00 | 25.50 | 1.75 |
Each arm is the distance from the toe to the middle of the level: level 2, for instance, runs from 0.50 to 2.50 m, so its middle is at 1.50 m.
Step 2: the earth pressure
The back of the wall is a vertical plane, , from the heel to the crest, and no soil rests on the baskets inside it. The thrust is Coulomb’s on that plane, with a level backfill and a wall friction of half of , = 16°, the most AASHTO gives a modular wall with a continuous back (Table C3.11.5.9-1):
The vertical effective stress behind the wall is kPa at the water, 2.00 m down, and kPa at the base. The thrust is times the area of that diagram:
It acts at = 16° from the horizontal, so it pushes the wall with kN/m and bears down on its back with kN/m. Its height above the base is the centroid of the same diagram:
taking the triangle above the water, the rectangle below it and the triangle below it, whose area is .
Step 3: the water
Behind the wall the water stands 1.00 m above the base:
at 0.33 m above the base. The creek pushes back on the face, but the check leaves it out, as it leaves out the soil in front of the wall: the safe side. Under the base, the water pushes up with kPa at the heel and at the toe:
at the middle of the base, 1.25 m from the toe.
Step 4: the forces and the eccentricity
| Force | Vertical (kN/m) | Horizontal (kN/m) | Arm (m) | Moment about O (kN·m/m) |
|---|---|---|---|---|
| 51.08 | 1.25 | 63.855 resisting | ||
| 34.00 | 1.50 | 51.000 resisting | ||
| 25.50 | 1.75 | 44.625 resisting | ||
| 6.08 | 2.50 | 15.208 resisting | ||
| 21.21 | 1.03 | 21.911 overturning | ||
| 4.905 | 0.33 | 1.635 overturning | ||
| −24.525 | 1.25 | 30.656 overturning | ||
| Total | 92.14 | 26.12 | 174.69 and 54.20 |
The resultant falls 0.058 m behind the middle of the base, well within the middle third. The overturning ratio, , is only a reference: AASHTO judges overturning by where the resultant falls.
Step 5: sliding
The base slides on the foundation soil. FHWA takes the friction there as the lesser of the infill’s and the foundation soil’s (FHWA-NHI-07-071, 6.6.3), here the soil’s = 34°, and the passive resistance in front of the toe is left out:
Step 6: bearing capacity
The base is a strip footing m wide, 0.50 m deep, under an inclined load. By AASHTO LRFD’s equation (10.6.3.1.2a), with :
- For = 34°: and .
- A long strip has no shape factors, , and the depth factor is taken as , without counting the shear strength of the soil above the base.
- The load leans: . Across a strip, AASHTO’s exponent is , so and .
- The water stands above the ground in front, so (Table 10.6.3.1.2a-2), with the total unit weight = 19.5 kN/m³.
Against the load spread evenly over , kPa:
Step 7: each level on the one below
Levels 2 and 3 on level 1. The block is 2.00 m high and stands above the water. Its earth pressure is the backfill’s over those 2.00 m: kN/m, so kN/m, with = 9.89 kN/m and = 2.84 kN/m, at 0.67 m above the joint.
About the toe of level 2, 0.50 m from O, the arms are 1.00 m for level 2, 1.25 m for level 3 and 2.00 m for :
Level 3 on level 2. The block is 1.00 m high: kN/m, kN/m, with = 2.473 kN/m and = 0.709 kN/m at 0.33 m above the joint.
Step 8: the results
| Check | Value | Limit | Passes |
|---|---|---|---|
| Sliding of the wall | 2.38 | ≥ 1.5 | yes |
| Eccentricity of the wall | 0.058 m | ≤ 0.417 m | yes |
| Bearing capacity | 6.45 | ≥ 3.0 | yes |
| Levels 2 and 3 on level 1: sliding | 4.41 | ≥ 1.5 | yes |
| Levels 2 and 3 on level 1: eccentricity | 0.042 m | ≤ 0.333 m | yes |
| Level 3 on level 2: sliding | 7.42 | ≥ 1.5 | yes |
| Level 3 on level 2: eccentricity | 0.011 m | ≤ 0.25 m | yes |
The wall passes every check. Sliding on the base governs, with the smallest margin: the water takes a fifth of the weight off the base with its uplift, and adds its own thrust to the earth’s.
The same wall in Rischio
This example is the Gabion wall on a creek bank template of Rischio’s retaining wall tool, in free mode, with factors of safety. Rischio’s engine gives the same values as the hand calculation above: = 0.2782, = 21.21 kN/m, = 92.14 kN/m, sliding 2.38, an eccentricity of 0.058 m and a bearing capacity of 249.3 kPa for a factor of safety of 6.45, and, level by level, 4.41 and 0.042 m, 7.42 and 0.011 m.
Try it here: this is the studio’s editor with that wall. Change a level, the backfill or the water and calculate; the engine checks the whole wall and each level on the one below.
How Rischio treats the levels and the weight of gabions under water is in Gabion walls. The checks it shares with every wall, step by step on a cantilever wall, are in retaining wall design.
How a gabion wall is built
FHWA’s sequence (FHWA-NHI-07-071, 6.4.2):
- Excavate to the foundation level, with temporary support if the slopes won’t stand. Remove vegetation, organic matter and weak or compressible soil, level the ground and proof-roll it. A gravel bedding or a concrete leveling pad often gives a working surface and sets the line and level of the wall.
- Unfold each woven basket, raise its sides and lace its edges, corners first, then its diaphragms.
- Set the empty baskets in place, lace them to their neighbors along every edge that touches, and stretch them taut along the line of the wall before filling.
- Fill the baskets in layers, a 0.9 m basket in three, placing ties between the front and back faces at the top of the first and second layers so the face doesn’t bulge. Fill neighboring baskets to the same level at each stage, without damaging the wire or its coating.
- Level the last layer of stone with the top of the basket, close the lid and tie it to the sides, the ends and the diaphragms.
- Cover the back and the steps with the geotextile or soil filter before placing the backfill, and compact it to at least 95% of the maximum dry density of AASHTO T 99, 100% in its top 0.3 m (1 ft).
Frequently asked questions
How high can a gabion retaining wall be?
FHWA gives gabion walls up to about 7.6 m (25 ft) as cost-effective, and typically not above it. Walls higher than about 3 m are usually battered back into the soil to improve their stability.
Do gabion walls need a foundation?
They need no concrete footing, but they need a prepared base: weak and compressible soil removed, the ground leveled and proof-rolled, and often a gravel bedding or a concrete leveling pad. Their bearing capacity is checked like any wall’s.
Do gabion walls need drainage?
The stone drains freely, so FHWA designs gabion walls without water pressure, as long as the backfill doesn’t trap water. A filter, of geotextile or graded soil, goes between the baskets and the backfill so the soil doesn’t wash into the stone, and a wall in a river needs a free-draining backfill.
What size of stone goes in gabions?
Sound, durable, well-graded rock between 100 and 250 mm (4 and 10 in), with no piece under 100 mm in its smallest dimension.
How long does a gabion wall last?
Its weak point is the wire: FHWA notes that its long-term durability may be questionable, particularly in corrosive environments. Permanent walls use galvanized wire at least 2.5 mm in diameter, with a PVC coating in sea water or polluted water, and sound, durable stone.
References
- AASHTO (2024). LRFD Bridge Design Specifications, 10th edition. Articles 3.11.5.3, 3.11.5.9, 10.6.3 and 11.6.
- FHWA (2002). Shallow Foundations, Geotechnical Engineering Circular No. 6, FHWA-IF-02-054.
- FHWA (2008). Earth Retaining Structures, FHWA-NHI-07-071, Chapter 6.