Calculation report
- Model
- Earth irrigation canal
- Analysis
- Open channel
- Date
- 17 November 2026
- Units
- SI · kN, m, kPa
1Scope
This calculation makes these checks:
- Section capacity
- Freeboard
2Summary
Of the model's 2 checks, the one with a limit is satisfied; the others have no limit, and no verdict.
| Check | Value | Limit | Margin | Result |
|---|---|---|---|---|
| Section capacity | 2.50 m³/s | ≤ 3.47 m³/s | +28 % | OK |
| Freeboard | 0.209 m | — | — | — |
3Model
Section
Earth canalCross-section
| Vertex | m | m | |
|---|---|---|---|
| 1 | 0.00 | 1.40 | 0.025 |
| 2 | 2.10 | 0.00 | 0.025 |
| 3 | 4.10 | 0.00 | 0.025 |
| 4 | 6.20 | 1.40 |
Horizontal position · Elevation · Roughness of the segment to the next vertex
Flow
Flow conditionsUniform flow
| Bed slope | 0.0003 m/m |
| Discharge | 2.5 m³/s |
Where the values come from
Each value above is the designer's, as typed in the model.
4Normal flow
Water surface elevation
Normal depth, by Manning
where = 2.50 m³/s
Normal depth
Flow area
Wetted perimeter
Hydraulic radius
where = 4.51 m², = 6.29 m
Equivalent roughness
Horton–Einstein (Chow, Eq. 6-17)
where = 6.29 m
Mean velocity
where = 0.025, = 0.716 m, = 0.000300 m/m