Pile settlement
How Rischio calculates the settlement of a drilled shaft and of a pile group: the shaft's load-transfer curves and the group's equivalent footing.
Each settlement is checked at Service I against the tolerable settlement the designer gives, : AASHTO leaves it to the structure (10.5.2.1), so no usual value stands beside it. Units, symbols and assumptions are set out in Method and assumptions.
One drilled shaft
A single drilled shaft in soil settles by AASHTO’s normalized load-transfer curves (10.8.2.2.2), O’Neill and Reese’s trend lines for the side and the base, in sand and in clay, as settlement over the diameter. Each piece of the shaft mobilizes part of the side resistance its stratum gives it there as it moves, in a clay none in the shaft’s top 5 ft (AASHTO 10.8.3.5.1b), as the capacity counts it, and the base part of its tip resistance. Rischio finds the movement at which the head carries the load, and from it the share of side and base and the load down the shaft, which the studio draws as the axial load. The settlement is the base’s movement plus the shaft’s own shortening, , which takes : the designer’s or, left empty, its concrete’s by AASHTO (Method and assumptions).
AASHTO settles driven piles as a group (10.7.2.3), so a single driven pile has no settlement of its own.
A group
The group settles as an equivalent footing (AASHTO 10.7.2.3; 10.8.2.2.4 for drilled shafts): its plan the group’s outline, at two thirds of the piles’ penetration into the bearing layer, or at the neutral plane where that is deeper. The bearing layer is the toe’s stratum and the strata of its same soil right above it, unless a soft clay ( under 24 kPa, 0.50 ksf, FHWA GEC 12 Table 5-9) lies over a firmer one: the footing then goes two thirds into the firmer one, as AASHTO’s Fig. 10.7.2.3.1-1 draws a group driven through a soft layer. The nominal dead load spreads below the footing 1 horizontal to 2 vertical:
at the middle of each layer below the footing, below it. Each clay’s part within the depth the load reaches (below) is cut in equal layers of at most 5 ft (1.524 m), as FHWA divides it (GEC 12, §7.3.5.5; FHWA-NHI-16-064, D.39), within AASHTO’s increments of 5 to 10 ft (C10.6.2.4.3). Each layer consolidates by its , or by and when it is overconsolidated, on and at its middle and its , the stratum’s times its , as a footing’s clay does, and the clay settles their sum; with its it also comes with its time, as a footing’s clay in time. A thick clay right under the footing settles far more in layers than as one layer at its middle: 10 m of a normally consolidated clay under a 3 m equivalent footing, about 47 % more. The piles’ elastic compression, with the drag where the ground settles around them, is added (10.7.2.5), on their . The sum is the group’s settlement , checked against the settlement the structure tolerates.
The group’s settlement takes every stratum its load reaches below the footing, down to where falls under a tenth of the ground’s (FHWA GEC 12, §7.3.5.5) or to the rigid layer under the soil, each by its own method: a silt or a clay by its consolidation, as above, and a gravel, a sand, a silty sand or a silt without consolidation data by Hough’s method, below. Rischio gives only where it computes all of them, starting with the one the footing sits in. A clay without its consolidation data, a coarse stratum without its or whose blow count falls off Hough’s chart, a clayey sand or a rock fill, which the chart has no curve for, and a group on rock leave the group without a settlement or a check; each part Rischio computes then keeps its own name: the equivalent footing and the stress below it, each clay’s consolidation, the sands’ settlement by Hough and the piles’ elastic compression.
Sands and gravels, by Hough
AASHTO allows Hough’s method with the equivalent footing (10.7.2.3.2, 10.6.2.4.2b), and FHWA’s design example settles a group in gravel with it (FHWA-NHI-16-064, D.27). The part of each coarse stratum the load reaches is cut in equal layers of at most 5 ft (1.524 m), as FHWA does (GEC 12, §7.3.5.5), within AASHTO’s 10 ft. The depth is the group’s, GEC 12’s tenth of : AASHTO’s commentary takes a spread footing’s to about three times its width (C10.6.2.4.2b), and says nothing of a group’s, for which it sends to GEC 12. Each layer settles
on and at its middle, and the sands settle the sum, (AASHTO Eqs. 10.6.2.4.2b-1 and -2, with 1.00). The bearing capacity index is read off AASHTO’s chart (Fig. 10.6.2.4.2b-1) at the layer’s corrected blow count: the stratum’s , the average of its readings, corrected for the overburden at the layer’s middle, with , in ksf (Eqs. 10.4.6.2.4-1 and -3). A gravel and a sand read the clean well graded fine to coarse sand’s curve, the lower of the curves that could be theirs, as FHWA takes a dense gravel; a silty sand reads the well graded fine to medium silty sand’s; a silt, the inorganic silt’s, which is for a silt without plasticity (a plastic one settles by its consolidation). Hough’s method was developed for normally consolidated cohesionless soils (C10.6.2.4.2b). Where a layer’s blow count falls off its curve there’s no to read: a warning says so, and the group has no settlement of its own.
A group of drilled shafts settles as a group: no shaft in it has a settlement of its own (AASHTO 10.8.2.2.4).
References
- AASHTO (2024). LRFD Bridge Design Specifications, 10th ed. Articles 10.4.6.2.4, 10.6.2.4.2b, 10.7.2.3, 10.7.2.5 and 10.8.2.2.
- Hough, B. K. (1959). Compressibility as the Basis for Soil Bearing Value. Journal of the Soil Mechanics and Foundations Division, Vol. 85, Part 2. American Society of Civil Engineers.
- Samtani, N. C., & Nowatzki, E. A. (2006). Soils and Foundations Reference Manual, Volume I, FHWA-NHI-06-088. Federal Highway Administration. Hough’s chart as AASHTO reprints it.
- O’Neill, M. W., & Reese, L. C. (1999). Drilled Shafts: Construction Procedures and Design Methods, FHWA-IF-99-025. Federal Highway Administration. The normalized load-transfer curves.
- Brown, D. A., Turner, J. P., Castelli, R. J., & Loehr, E. J. (2018). Drilled Shafts: Construction Procedures and Design Methods, FHWA-NHI-18-024 (GEC 10). Federal Highway Administration.
- Hannigan, P. J., et al. (2016). Design and Construction of Driven Pile Foundations, Vol. I, FHWA-NHI-16-009 (GEC 12). Federal Highway Administration. The group’s equivalent footing.