Settlement
A footing's stress below, its immediate settlement, elastic or by Schmertmann's method, and the consolidation of a silt or a clay in Rischio.
The stress the footing adds below its base is always computed. The immediate settlement is the elastic one by default, or Schmertmann’s where the designer chooses it in Methods, and each silt or clay stratum with its compression index and void ratio also consolidates. The settlement check takes their total. The units, conventions and assumptions are in Method and assumptions.
Stress increase below the base
The footing adds to the soil below it its net pressure, what it puts on the base beyond the overburden the excavation took away:
spread over the base as a flexible, uniform load. The increase at a depth below the centre comes from Boussinesq’s elastic solution: under a rectangle, four rectangles that meet at the centre, each with the influence value below its corner (with and of the quarter); under a strip and a circle, their closed forms:
with , the angle the strip subtends from the point.
A stratum’s average increase is the integral of the curve over the stratum, from its top to its bottom below the base, and each layer its consolidation is divided into takes its own, over the layer:
which is what Griffiths’ influence values give for a rectangle.
The stress bulb is Boussinesq’s in the section across the width, down to : the studio draws the lines where it is 0.8 to 0.1 of . A horizontal load on the base adds to it Cerruti’s solution integrated over the area (Harr’s for a strip), which raises ahead of the load and lowers it behind, and leaves it unchanged below the centre.
Elastic settlement
The elastic settlement (AASHTO 10.6.2.4.2a) is the immediate settlement at the centre of the base by the theory of elasticity, for any soil, when every stratum has its and . and are the thickness-weighted averages of the strata from the base down , or to the end of the profile if it comes first.
In the settlement equation, is the net pressure, the vertical load over the full base less the overburden the excavation took away, as every settlement method here takes it. A circle settles as the square of its area, of side : Steinbrenner’s factors are for rectangles. with gives the centre of a flexible, uniformly loaded base, as four rectangles that meet there; there is no reduction for a rigid footing.
Each stratum has one : a modulus that rises with depth, as in most clays and sands, is several strata, each with its own.
Steinbrenner’s shape factor
The shape factor is Steinbrenner’s, with and . is the depth from the ground surface to the rigid layer, where the profile ends at a rock or at a last stratum with its thickness. His factors are for a foundation at the ground surface, so runs from there, and Fox’s then accounts for the embedment:
Without a rigid layer, where the last stratum goes on down, : and is Schleicher’s factor. Rischio evaluates these expressions instead of interpolating and in tables. A strip takes , where has converged.
Fox’s depth factor
The depth factor is interpolated linearly in Fox’s table, for of 1, 2 and 5, by , and . The table covers from 0.5 to 1 and from 0.3 to 0.5. Beyond it, , and a deeper take its nearest edge (a strip, the last row). Between , where , and the table’s first column, , is linear.
Schmertmann’s method
Schmertmann’s strain influence method (AASHTO 10.6.2.4.2c) is for cohesionless soils, and the designer chooses it in Methods. Each stratum it reaches takes its own , as measured in situ, so . The strain influence factor rises from the base to a peak at and falls to zero at , each linear in from 1 to 10 (a strip is 10):
and the settlement sums the strata down to :
The sum runs over sublayers, the strata cut at , each with at its middle; the trace shows each one’s , and , and , which takes. is the load’s Time since loading, in years; without one, . A silt or a clay within that has its consolidation settles by it instead, added to the method’s, as 10.6.2.4.2c asks; one without it leaves the method out, and the model says which stratum.
Consolidation
A silt or clay stratum below the base with its compression index and initial void ratio consolidates under the footing (AASHTO 10.6.2.4.3). Its part below the base, thick, is divided into equal layers no thicker than 10 ft (3.048 m), each settled on its own, and the stratum’s settlement is their sum: AASHTO C10.6.2.4.3 divides the compressible layer into increments of typically 5 to 10 ft, because the footing’s stress fades with depth while grows. Each layer, thick, takes , the effective vertical stress at its middle before the footing, and its own . Under AASHTO it consolidates under the permanent loads only (10.6.2.3).
The stratum’s preconsolidation pressure gives its overconsolidation ratio, with at the middle of the whole stratum in the ground. The ratio is the same in each layer, so each layer’s preconsolidation pressure is , as FHWA’s design example of a pile group takes it from samples near each stratum’s middle (FHWA-NHI-16-064, D.39). The one-dimensional settlement of each layer follows from where falls against . Without , or with an of 1, the layer is normally consolidated; above 1, it needs its swelling index :
for a normally consolidated layer, an overconsolidated one that stays below , and one the footing takes past it. The report gives each layer and says which applies. A 10 m clay right under a 3 m footing settles about 15 % more in layers than as one layer at its middle. An underconsolidated stratum, , is taken as normally consolidated from each layer’s , with a note.
In time
With its coefficient of consolidation , the stratum’s settlement also comes with its time. It drains through the faces it shares with a drained soil or the ground surface; a clay or a rock beside it doesn’t drain. Drained through both faces, the drainage path is ; through one, , the stratum’s thickness. With no face to drain through, the model says so on its .
with the excess pore pressure constant with depth at the start.
The report gives and , the times to half and to nine tenths of the settlement, and its curve in time. With the load’s Time since loading , it also gives , and at it. The settlement check takes the final settlement.
Total settlement
The settlement check takes the total, , the parts the model has. In free mode it is weighed against the designer’s limit, with FHWA GEC 6’s 25 mm (§8.3.1), the order of total settlement a footing usually tolerates, beside it as a reference. Under AASHTO it is checked at Service I against 25 mm, which the designer can edit; the immediate settlement takes the code’s , and an eccentric load settles on the effective area with the load centred (10.6.1.3).
What isn’t included
The settlement of an eccentric footing’s edges, or its tilt. Punching shear, bending and reinforcement of the footing are outside the tool.