FHWA-NHI-16-064, Example D.22.1.1 · H-pile, design flood
H-pile, design flood, Example D.22.1.1 of FHWA-NHI-16-064, solved in Rischio. Toe resistance after scour, Rp: 232.9 kips (source: 238.0 kips).
SourceManual
Hannigan, Rausche, Likins, Robinson & Becker (2016). Design and Construction of Driven Pile Foundations: Comprehensive Design Example (FHWA-NHI-16-064). Federal Highway Administration. Example D.22.1.1, p. 101–103.
ID fhwa-nhi-16-064-d22-1-1
Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to hello@rischio.io.
The problem
What the source calculates: shaft resistance in the gravel after scour and toe resistance after scour, Rp. Its problem, as Rischio's editor opens it under AASHTO LRFD 10th (2024):
Source vs Rischio
| Source | Rischio | Difference | |
|---|---|---|---|
| Shaft resistance in the gravel after scour | 9.3 kips | 9.46 kips | +1.7 % |
| Toe resistance after scour, Rp | 238.0 kips | 232.9 kips | −2.1 % |
Opened in the studio under AASHTO LRFD 10th (2024), the model passes every check.
The manual's values come from the DrivenPiles program, whose table for this flood (D-52) is offset 1 ft from those before scour and at the check flood: the values shown are its 9 ft and 39.99 ft rows, which are the other tables' 9.99 and 40.01 ft. Rischio reads Nordlund's coefficients off AASHTO's charts, so its resistances can differ by up to 3 %; in the clay the program takes an adhesion chart for smooth steel piles where AASHTO's 10th edition asks for Tomlinson's α, so the pile's total resistance isn't compared. The model carries the load on the most loaded pile (Tables D-58 to D-61): its permanent part as dead load, and the rest of its Service I load, the traffic and the cap's moments, which the manual doesn't separate, as live load. Rischio factors it at Strength I to 305 kips, on the safe side of the manual's Strength V, 257 kips, which takes the traffic at 1.35 and adds the wind.
How it's calculated
- Shaft resistance →How Rischio adds up a pile's shaft, stratum by stratum: a driven pile by Tomlinson's α in clay and Nordlund's method in sand, a drilled shaft by FHWA GEC 10.
- Equations →Every step of the calculation, in order.
- Piles in Rischio →The tool: what it checks, and its calculation report.
Nearest examples
- FHWA-NHI-16-064, Example D.22.1 · H-pile through clayFederal Highway Administration (2016): toe resistance, Rp