FHWA GEC 10 (2018), Example 11.6.1 · 2 × 2 shaft group
2 × 2 shaft group, Example 11.6.1 of Federal Highway Administration (2018), solved in Rischio. Load on the least loaded shaft, Rz1: 340 kips (source: 340 kips).
SourceManual
Brown, Turner, Castelli & Loehr (2018). Drilled Shafts: Construction Procedures and Design Methods (FHWA-NHI-18-024). Federal Highway Administration. Example 11.6.1, p. 11-21.
ID fhwa-nhi-18-024-11-6-1
Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to hello@rischio.io.
The problem
What the source calculates: load on the most loaded shaft, Rz2 and load on the least loaded shaft, Rz1. Its problem, as Rischio's editor opens it in free mode:
Source vs Rischio
| Source | Rischio | Difference | |
|---|---|---|---|
| Load on the most loaded shaft, Rz2 | 530 kips | 530 kips | 0.0 % |
| Load on the least loaded shaft, Rz1 | 340 kips | 340 kips | 0.0 % |
Opened in the studio in free mode, with no limits set, the model gives each value without a verdict.
The example gives no ground: the model's clay and the shafts' length only let the tool run, and the loads on the shafts don't depend on them. The model's loads are the example's at the shafts' heads: the 1,500 kips with the cap's 240 (1,740 kips), and the 1,800 kip-ft plus 120 kips times the cap's 4 ft (2,280 kip-ft); the 120 kips themselves, which the example shares out as an average 30 kips a shaft, are left out.
How it's calculated
- Pile groups →How Rischio checks a single pile and a pile group: the group as individual piles or as one block, Skempton's factor in clay, and the group efficiency.
- Equations →Every step of the calculation, in order.
- Piles in Rischio →The tool: what it checks, and its calculation report.
Nearest examples
- FHWA GEC 10 (2018), Example 10-1 and 10-3 · Drilled shaftFederal Highway Administration (2018): toe resistance, RBN
- FHWA GEC 10 (2018), Example 9.3.3.3.4 · Shaft, lateral loadFederal Highway Administration (2018): largest bending moment, Mmax
- FHWA-NHI-16-064, Example D.35 · Two-row pile groupFederal Highway Administration (2016): load on the least loaded pile