Rischio
Start free

DocsVerified examples

FHWA GEC 11 (2023), Example C1 · MSE wall with steel strips

MSE wall with steel strips, Example C1 of Federal Highway Administration (2023), solved in Rischio and compared with the source's answers.

SourceManual

Taylor, Collin, Boyle, Fishman & Han (2023). Design and Construction of Mechanically Stabilized Earth (MSE) Walls (FHWA-HIF-24-002). Federal Highway Administration. Example C1, p. C-2.

ID fhwa-hif-24-002-c1

Open in the studioA copy, in your accountOpen the PDF

Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to hello@rischio.io.

The problem

What the source calculates: sliding capacity/demand ratio at Strength I (critical), CDR, factored pressure under the base at Strength I (maximum), σv, eccentricity at Strength I (critical), e and pullout capacity/demand ratio at layer 8 (z = 18.75 ft) by the Simplified Method, CDR. Its problem, as Rischio's editor opens it under AASHTO LRFD 10th (2024):

The model, as the editor draws it. In the source: Figure C1-1, p. C-2.

Source vs Rischio

SourceRischioDifference
Sliding capacity/demand ratio at Strength I (critical), CDR1.941.94+0.1 %
Factored pressure under the base at Strength I (maximum), σv6.91 ksf6.90 ksf−0.1 %
Eccentricity at Strength I (critical), e2.05 ft2.04 ft−0.6 %
Pullout capacity/demand ratio at layer 8 (z = 18.75 ft) by the Simplified Method, CDR1.101.10+0.2 %

Opened in the studio under AASHTO LRFD 10th (2024), the model fails at least one check.

The example's Simplified Method analysis, the one the model follows, puts a third strip per panel in its three lowest layers; the model can't hold it and keeps two in every layer, so those three fail Rischio's rupture check.