FHWA-NHI-00-043, Example 4.7 · Modular block geogrid wall
Modular block geogrid wall, Example 4.7 of Elias et al. (2001), solved in Rischio. Factor of safety for bearing capacity: 5.87 (source: 5.89).
SourceManual
Elias, V., Christopher, B. R., & Berg, R. R. (2001). Mechanically Stabilized Earth Walls and Reinforced Soil Slopes: Design and Construction Guidelines (FHWA-NHI-00-043). Federal Highway Administration. Example 4.7, p. 145.
ID fhwa-nhi-00-043-4-7
Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to hello@rischio.io.
The problem
What the source calculates: factor of safety against overturning, eccentricity for bearing, e and factor of safety for bearing capacity. Its problem, as Rischio's editor opens it in free mode:
Source vs Rischio
| Source | Rischio | Difference | |
|---|---|---|---|
| Factor of safety against overturning | 5.2 | 5.19 | −0.1 % |
| Eccentricity for bearing, e | 0.67 m | 0.68 m | +0.9 % |
| Factor of safety for bearing capacity | 5.89 | 5.87 | −0.3 % |
Opened in the studio in free mode, with no limits set, the model gives each value without a verdict.
The model opens without limits, so Rischio gives no verdict where the example finds the wall's sliding, overturning, eccentricity and bearing within its limits. Its grids are 0.61 m apart all the way down, where the report closes them to about 0.41 m below 5.95 m, so the model's lowest grid has a rupture factor of safety the example's layout doesn't.
How it's calculated
- MSE walls →How Rischio checks an MSE wall: each layer's load by AASHTO's method for its reinforcement, its rupture and pullout, and the block outside.
- Equations →Every step of the calculation, in order.
- Retaining walls in Rischio →The tool: what it checks, and its calculation report.
Nearest examples
- FHWA-NHI-00-043, Example 4.6 · Steel strip wall, ASDElias et al. (2001): eccentricity, e
- FHWA-NHI-07-071, Example 7.9 · Precast panel MSE wallTanyu et al. (2008): factored rupture resistance, φ Tal Rc
- FHWA GEC 11 (2009), Example E1 · MSE wall, broken backfillBerg et al. (2009): pullout capacity/demand ratio at layer 2, CDR