FHWA-NHI-16-064, Example D.11 · Each pile's load in a group
Each pile's load in a group, Example D.11 of FHWA-NHI-16-064, solved in Rischio. Load on the most loaded pile: 323 kips (source: 323 kips).
SourceManual
Hannigan, Rausche, Likins, Robinson & Becker (2016). Design and Construction of Driven Pile Foundations: Comprehensive Design Example (FHWA-NHI-16-064). Federal Highway Administration. Example D.11, p. 46-49.
ID fhwa-nhi-16-064-d11
Rischio isn't affiliated with the source's authors or publishers. If you hold its rights and want this example removed, write to hello@rischio.io.
The problem
What the source calculates: load on the most loaded pile. Its problem, as Rischio's editor opens it in free mode:
Source vs Rischio
| Source | Rischio | Difference | |
|---|---|---|---|
| Load on the most loaded pile | 323 kips | 323 kips | +0.1 % |
Opened in the studio in free mode, with no limits set, the model gives each value without a verdict.
How it's calculated
- Pile groups →How Rischio checks a single pile and a pile group: the group as individual piles or as one block, Skempton's factor in clay, and the group efficiency.
- Equations →Every step of the calculation, in order.
- Piles in Rischio →The tool: what it checks, and its calculation report.
Nearest examples
- FHWA-NHI-16-064, Example D.10.2, D.13 · H-pile in upliftFederal Highway Administration (2016): nominal uplift resistance, Rs
- FHWA-NHI-16-064, Example D.13 · Pile row uplift, soil blockFederal Highway Administration (2016): weight of the soil block, W
- FHWA GEC 10 (2018), Example 11.6.1 · 2 × 2 shaft groupFederal Highway Administration (2018): load on the least loaded shaft, Rz1